Journey Time

Under 30 min
30–60 min
60–90 min
This station
London Terminal
Found your perfect commute? Now find your perfect home.
Over 150 branches nationwide • Free online valuations • Expert local knowledge
Search Now

Train times from Havant to London

Havant connects to 1 London terminal. The fastest route is Waterloo in 78 minutes on a direct train.

Fastest journey to London
78 minutes to Waterloo
Direct service
Yes
London terminals served
1 (Waterloo)
Operator
South Western Railway
Source
National Rail timetables, 2026
Data reviewed
2026-07-28

Havant to each London terminal

Journey times from Havant to London terminals
London terminalJourney timeServiceOperator
Waterloo78 minDirectSouth Western Railway

Havant to Waterloo

The fastest train from Havant to London Waterloo takes 78 minutes and involves a direct train with no change. The route is operated by South Western Railway. That makes Havant the 77th quickest of the 78 stations with a service into Waterloo inside 90 minutes.

Frequently asked questions

How long does the train from Havant to London take?

The fastest train from Havant reaches London Waterloo in 78 minutes. Havant connects to 1 London terminal: Waterloo.

Which London station should I travel to from Havant?

Waterloo is the quickest at 78 minutes, on a direct service. Direct trains run to Waterloo.

Is Havant a good commuter town for London?

At 78 minutes to London Waterloo, Havant is a longer commute, typically traded off against more space and lower housing costs. Direct trains keep the journey simple.

Are there direct trains from Havant to London?

Yes — direct services run to Waterloo.

What are the nearest stations to Havant?

The closest alternatives are Petersfield, Liss, Liphook. These can offer a faster or cheaper route into London depending on where you live.

Nearby stations

Alternative departure points close to Havant.

All London terminals

Data: journey times are the fastest typical weekday service on each route, compiled from published National Rail operator timetables for 2026. They exclude engineering works and disruption, and are not live departure times. Last reviewed 2026-07-28. Read the full methodology →